Proposal | Hybrid Planning application for an electrical interconnector with an approximate capacity of 1000 megwatts (MW) extending from Tourbe, Normandy (France) to Chilling, Hampshire.
Outline planning permission is sought at Daedalus for:
1. The erection of converter station buildings (to a maximum height of 22 metres) with associated, vehicular accesses and roads, security fencing, landscaping and temporary construction compounds;
2. Creation of public open space and associated facilities, grassland planting and tree planting.
Full Planning permission is sought at Hill Head and Stubbington for:
3. Installation of cables between Mean Low Water Springs and the converter station in the north eastern corner of Daedalus Airfield.
Full Planning Permission is sought at Chilling for:
4. The Installation of cables between the Mean Low Water Springs and the existing cable sealing end compound at Chilling Lane |